Every buyer has seen this at least once. The shipment arrives, the inspection report inside shows every dimension within tolerance, and two days later the parts will not go together on the assembly line. Nobody machined anything wrong, nobody measured anything wrong, and yet the assembly does not work.

The gap is not carelessness. It is the difference between what a standard inspection report measures and what an assembly actually needs. Understanding that difference is the fastest way to write a drawing that survives first production.

A Report Measures Features. An Assembly Needs Relationships.

A conventional dimensional report checks each feature against its own tolerance: this bore is 10.01 mm against 10.00 +0.05/-0.00, that face is 12.2 mm from the edge. Each line passes.

But what usually decides whether an assembly works is not a single feature — it is the relationship between features. A bore can be perfectly round and perfectly sized, yet sit 0.08 mm away from the datum the mating shaft references. Every individual measurement passes; the assembly does not care, because the shaft aligns to the datum, not to the edge.

This is why geometric tolerances — position, profile, perpendicularity — exist. If the function of your part depends on where a feature sits relative to a datum, say so with a position tolerance and a named datum. A drawing that leaves this to interpretation invites every supplier to measure from whichever surface is convenient.

Tolerance Stack-Up Across Mating Parts

The second silent failure mode is stack-up. Three plates, each flat within ±0.05, stacked and bolted together, can be 0.15–0.3 mm off in the worst case. Each part passed. The stack did not.

If a gap, alignment, or seal face in your assembly depends on several parts in a chain, the drawing should either tighten the specific dimensions in that chain or define how the stack is controlled. Sending the same blanket tolerance to every feature raises the price of every part without protecting the one interface that matters.

Whose Datums Did the Shop Actually Use?

On many drawings, the datum letters are defined but the report measures from whatever surfaces the fixture could reach. The numbers are real, but they are answers to a different question than the one your assembly asks.

One sentence in the RFQ prevents this: “Final inspection must reference datums A, B, C as defined on the drawing.” If a supplier cannot do that — because they have no CMM, or their fixtures cannot reach the datum features — you want to know before the order, not after the parts arrive.

Burrs, Edges, and Sealing Surfaces

Machined parts leave burrs. That is normal. What separates suppliers is whether the burrs are removed consistently on the surfaces that matter: O-ring grooves, sliding interfaces, electrical contact pads, and any edge a wire or hose passes over.

A burr is rarely on the inspection report because it is not a dimension. But it is one of the most common causes of assembly problems and field leaks. Specify edge-break requirements on functional edges — “break all edges 0.2–0.4” is enough — and sealing surfaces should be explicitly called out.

Cleanliness and Packaging

Chips inside threads, coolant residue, and packaging that imprints or distorts thin sections cause failures that no report will ever show. Parts machined correctly can arrive unusable because they were packed loose in a bag with swarf from the deburring bench.

For precision assemblies, say what “clean” means: no chips in threads or bores, dry or lightly oiled per spec, individually wrapped or separated. Suppliers who plan production properly already do this; asking for it costs nothing and filters out the ones who do not.

What to Put in the RFQ to Prevent All of This

Four additions to a standard RFQ close most of these gaps:

1. Name the datums that matter and require final inspection against them. 2. Define tolerance stack expectations for mated chains, or ask the supplier to flag risky chains during review. 3. State edge-break and surface-finish requirements on functional surfaces. 4. Specify packaging and cleanliness for precision parts.

A supplier that answers these points during drawing review — before quoting — is telling you how the whole project will run. One that quotes immediately and asks nothing is telling you something too.